Repetition the process which is done () with, the time when such as work it requires for the 1 time, task and job. Those which become frequency of process and the unit of period.
, if production plan is taken a second look 2 weeks at the production factory, these 2 weeks are "production cycle time". As for planned type tool and MRP of the productionmanagementsystem/ERP, it becomes with intended one to shorten production cycle time by actualizing the decision of fast production plan.
In addition, like model change of the automobile when new commodity development is done at fixed interval, this is called "development cycle time".PLMandPDM,CAD/CAEand the concurrentengineering etc. become the solution for development cycle time shortening.
With the Toyota manufacturing system you call the thing of "output interval" cycle time, the numerical - - which dividesproductivitynamely one mono with thing of the time when it spent on making, you are utilized the production lead time of one process as ???? of production lead time shortening.
Even withthe and six sigma, including waiting, and the like it means the substantial time which spent on work, it is used as index of
As a computer terminology, "after the device making request, until the following request accepts and becomes possible to be many the using and CPU cycle time, there is a memory cycle time and a time etc. in sense of time".
|