In the SAP system, if the production order has been completed, it is technically complete (Technical complete) way the order to operate, the purpose is to allow production orders to get rid of the reserve components. In general, it is widely used to carry out a manual way to shut down production orders technologies, and generally a business order planner is responsible for.
At SAP system, if the production order has been completed, it is the completion of technical (Technical complete) way the order to operate, the purpose is to allow production orders to get rid of the reserve components. In general, it is widely used to carry out a manual way to shut down production orders technologies, and generally a business order planner is responsible for it.
But the SAP system, production orders can also be achieved automatically complete the technical approach. Its principle is that when the production orders for "Automatic final confirmation" or "final confirmation", the system automatically set aside the order of production shut down and the status of production orders from the RELEASE become TECHNICAL.
To achieve the above purpose of self-closing needs to be set in the background in the system.
1, the background path: "SPRO-IMG-production - goods reserve price control - process - to confirm - the definition of recognition parameters", Transaction code for OPK4. Second, choose to define the type of production orders and the corresponding plants, go to the following interface. And then select the "X final confirmation," or "Automatic final confirmation," and then "reserve accounts outstanding" to check. For example:
A number of production orders, orders for the 100, with TCODE: CO11N confirmed that 100, and chose to confirm the type X final confirmation. Then the system will automatically the status of production orders from RELEASE to TECO, no manual to be completed for production of technical orders. At this point, if the A product BOM components under B, demand is 200 pieces, but that made a 190, this time production orders set aside another 10 were closed, and 10 components will enter the costs of production orders differences in the. |