Integration with other mySAP solutions
The integration of other cross-industry solutions of mySAP Business Suite with the mySAP SCM solution is always possible. About the link with mySAP PLM (Product Lifecycle Management) will ensure that all product from development through production to maintenance and procurement of spare parts can be tracked and controlled. The linking with mySAP CRM (Customer Relationship Management) enables to customer needs and requirements throughout the supply chain is taken into account. On the procurement side, the integration of mySAP SRM (Supplier Relationship Management) is a cross-company procurement be realized.
Master of mySAP SCM
Basic data objects that remain unchanged over a longer period a computer system used is referred to as master data. Within of mySAP SCM are data objects between SAP R / 3 and SAP APO on a real-time interface, the APO Core Interface (CIF) exchanged. From extensive SAP R/3-Datenmenge only those data objects to SAP APO handed down in the data structures of SAP APO for the various planning and optimization processes are required.
Material Master / product master
The material master is the central data object within the logistic processes. Are within the production planning and control in particular scheduling and process planning data is relevant. These data are maintained at the plant or storage location. Furthermore, classification contains documentation and quality management for the production of important information. In SAP APO materials are referred to as products.
BOM
BOMs are complete, formally structured list of components, consist of products or assemblies. The lists contain the object numbers of the components and the quantities and units. Data that are stored in lists, forms an essential basis for different areas of production planning and control. The MRP dissolves bills to purchase inexpensive or to determine production levels at a given time and the Production with the required components in the right quantity at provide the right time. Independent requirements relate to finished products, Dependent provide information on raw materials and semi finished products, used to manufacture the final product. Despite its central position within the production planning and control the data of the BOM in other divisions (eg sales, purchasing, estimating, construction) are needed.
Workplace / resource
Work includes master data object, the default values for work planning, be copied or referenced in work plans. The workplace establishes the connection to the cost center and thus provides for cost determination and the value flow. Furthermore, the job is the existing capacity from that through the establishment of different shift patterns also contain variable intervals can offer. Capacity offers due to scheduled maintenance or due to repairs be controlled through maintenance
|