With production process of the factory, at the time of product production the bill of material which is referred to.
When the product is produced, it is stop of the production line becoming problem the part and the like by the defect item of the fund material. In order to avoid this, the product which is produced some kind of part, as for the part total number which consists, becomes necessary for production it is necessary to grasp how many accurately. The list of the part which is prepared because of that is M-BOM.
M-BOM consists of the component information every of product, is used with stock verification and part arrangement and materials supply etc. of the part. With MRP and production system ERP it becomes with one of the core systems |